Acon Industries - Asphalt and Chipseal Services
  • Surfacing
    • Asphalt
    • Chipseal
    • Base
  • Our Projects
    • Commercial
    • Residential
  • Why Acon
    • Customer Feedback
  • About Us
    • Meet The Team
    • Contact
  • News

The Vines: Bethlehem

31/7/2017

 
Picture
Moon Civil contracted Acon Industries to lay 30mls of Asphalt at this new sub-division

Read More

Kombi Apartments - Mount maunganui

11/7/2017

 
Picture
We were subcontracted by iLine to excavate the site around this new apartment complex.
A 250mm base course preparation and then 30mm of Asphalt and nib kerbing.

Read More

Access Road-Western bay of plenty

3/7/2017

 
1300M2 of Base Course preparation and 2 coats of Chip Seal completed this access road to kiwifruit
Picture

Read More

port of tauranga

6/6/2017

 
Acon Industries Limited was sub contracted to lay 1300 tons of Asphalt for the container storage terminal at the Port of Tauranga in Mount Maunganui. 
Picture

Read More

Greerton village retailer parking area

13/2/2017

 
Picture
Armadillo Civil called us in to apply an asphalt surface to this 275m2 area after they completed the sewer and stormwater upgrade for Tauranga City Council, as well as a revamp to the service lane. Having already prepared the base, we then came in to finish the job with a full asphalt surface. 

Read More

Whakamarama earthworks

11/2/2017

 
Picture
This small job we completed at Whakamarama Earthworks included building the retaining wall and applying a hand laid asphalt surface to finish.         

Tyreworks rotorua

11/2/2017

 
Picture
​Tyreworks Rotorua needed a new surface for their yard. We applied a 40mm asphalt overlay to bring this area back up to scratch.         

Read More

bp rotorua forecourt

11/2/2017

 
Picture
We applied the 40mm asphalt overlay to the forecourt at the new BP service station at Lynmore Junction, Rotorua.         

Read More

council access road

11/2/2017

 
Picture
​The council access road to the settlement ponds, Bay of Plenty, needed surfacing. We applied a 40mm asphalt overlay to what was the steepest incline we have paved to date.

Read More

Lynley Park Subdivision, Omokoroa

9/2/2017

 
Picture
​With stage 8 about to be completed, the team from Armidillo Civil called us in to surface the 1850m2 area. This included final trim base preparation, a single coat membrane seal and 40mm asphalt overlay. Despite the challenges with the weather, the project was completed well within budget.

Read More
<<Previous
Forward>>

    RSS Feed

Picture
Picture
Picture
Picture
Picture
 © Acon Industries Ltd 2018 | Site by Formula One Results & Whitfield Consulting
  • Surfacing
    • Asphalt
    • Chipseal
    • Base
  • Our Projects
    • Commercial
    • Residential
  • Why Acon
    • Customer Feedback
  • About Us
    • Meet The Team
    • Contact
  • News